Large projects
Rushydro put into operation a cogeneration plant in Sovetskaya Harbour in Khabarovsk Krai, construction of which began in 2014. Installed capacity of the plant: electric - 126 MW, thermal - 200 Gcal/h. Annual power generation - 630 million kW/h, which is 3 times more than the capacity of the outdated Mayskaya GRES, which operates with high fuel consumption. The new cogeneration plant will run on coal from the Uralgalsky deposit.
Source: 1prime.ru

