Polyus plans to launch the first line of the gold extraction plant at the Sukhoi Log deposit in 2028 and the second line in 2029. Capacity of the plant will be 34 million tons of ore, producing 2.3-2.8 million ounces of gold per year, which will make it the most powerful plant in Russia. Recovery rate is planned at 91% above the group average of 83% in 2023. Polyus estimates total capex for the Sukhoi Log deposit project at $6 billion.