Severstal is carrying out preparatory and design work to start overhaul of blast furnace N4 Vologzhanka at Cherepovets Steel Mill. Furnace shutdown is scheduled for the second half of 2025. Overhaul will restore the furnace's design parameters, ensure high productivity, and ensure pig iron production with an increased share of iron ore pellets and reduced solid fuel consumption.