Rosseta Group opened the first inter-regional network management center in Kursk. The main feature of the center is its operation on the basis of the domestic operational information complex SK-11, which processes over 75 thousand signals per second. The Dispatcher manages the switching devices remotely, instantly receives information about any violations and has operational communication with 100% of the teams. The new control center is responsible for Kursk Region facilities. In the future, it will manage the power networks of the Orel Region. The maximum power consumption of the two regions mentioned above is 1 GW.