Russian Grids began construction of a high-temperature superconducting power transmission line in St. Petersburg. The cost of the project is ₽3.5 billion. The line will be laid underground by horizontal directional drilling, which will connect substations of the Central and Admiralteysky districts, where more than 400 thousand people live. The construction is expected to be completed in 2023.