Rosneft has started trial production at the Vostok Oil project

Владимир Петенёв
News editor
press@blackterminal.com
Rosneft Oil Company has started trial oil production at the Peschany section of the Payakhskoye field as part of the Vostok Oil project. In preparation for the technological launch in 2026, more than 700 km of oil pipeline has been welded and laid, including a 422 km double-pipe section. Construction readiness of the berths at the Port Bukhta Sever terminal has also been ensured. Construction of the first oil-loading berth is in a high state of readiness, and work on the construction of technological structures is ongoing at the second berth.
Роснефть НК
Роснефть НК
Review
Source: tass.ru
  • BlackTerminal.com 2016 - 2026.