Rosneft announced a tender for engineering surveys for the design of the first stage of the Vostok Oil Arctic project, including redirection of oil flows from the Vankor cluster to the north of Taimyr for further delivery via the Northern Sea Route. This will ensure the transportation of 30 million tons of oil through the NSR as early as 2024.