Experts inspected the production site and units at the Turkish plant MMK Metalurji and found that the plant in Dertjol did not suffer serious damage as a result of the recent earthquake. Plant is gradually returning to normal operation. First of all the continuous pickling plant and the reversing mill are started up. Metal from them should ensure the full load of MMK's plant in Dilovasa with a continuous hot-dip galvanizing unit and a polymer coating unit.